Picture (left) shows the scheme of the biowaste fermentation plant. To operate the plant, the material to be fermented is mashed to a maximum of 10 per cent solids content with the addition of water using a mixer and stored in storage vessel B01. The mixer mixes the contents of the vessel before and during each feed to the reactor. With the aid of the feed pump P01 (eccentric screw pump), the bioreactor B02 is periodically fed with the mashed organic waste several times a day. The bioreactor B02 is mixed by gas injection. The hydraulic residence time in the bioreactor is about 10 days. The bioreactor is tempered to about 30-37 °C by means of a heating/cooling thermostat (mesophilic operation), because in this temperature range an adapted anaerobic mixed population of microorganisms works optimally. The amount of biogas formed is registered by a gas meter. The entire control of the bioreactor plant is done by a programmable logic controller.
The plant is installed directly next to DAE's Environmental Education Centre. On the occasion of the "1º Seminário Internacional de Biotecnologia", organized by the Universidade Metodista de Piracicaba and the Fraunhofer IGB, an excursion to the "Biodigestor" took place on October 18, 2007.